Skip to content

Qingdao Chengyang Stadium

Qingdao Chengyang Stadium

Photo Gallery

Client

Construction began on the Qingdao Youth Football Stadium, one venue for the 2023 AFC Asian Cup, on July 31 in Chengyang district, Qingdao.

Construction on the stadium will last 833 days, and it is expected to be completed before November 2022.

This structure has been equipped in 2020 with a Zebra-P12.5 LED screen of a size of 360㎡. This product It is suitable for building a super-large outdoor display screen and is the first choice for creating a landmark dynamic display landscape. This product is light, slim and permeable, perfect to use for your architectural facade.

Regarding this project, it brings an innovative touch, illuminates the building and attracts the attention of people. This makes it easier for tourists to find the building but also seduces them which brings them to enter the building.

Qingdao Chengyang Stadium
Facade building

Installation

installation zebra led mesh building facade
installation zebra pixel led mesh on building facade
during installation led mesh zebra building facade
judi bola online daftar slot gacor online slot online pragmatic play slot server jepang https://slotgacormax.win/ https://wwwl24.mitsubishielectric.co.jp/